首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
财务会计
共用题干 An Expensive MistakeIs there water
共用题干 An Expensive MistakeIs there water
Loveyou
2019-12-17
20
问题
共用题干An Expensive Mistake
Is there water on the planet Mars?Is there life in Mars? Was there ever life on Mars? Scientists from NASA wanted to know the answers to these questions.They built a space-craft to travel around Mars and get information.The spacecraft was called the Mars Climate Orbiter.
The Mars Climate Orbiter left for Mars in December 1998.The trip took nine and a half months.At first,everything was fine.However,when the Orbiter got near Mars,something terrible happened.The spacecraft didn't go to the right place.It went too close to Mars.It was too hot for the Orbiter there.The spacecraft couldn't function correctly.Suddenly,it stopped sending messages to NASA.The Orbiter was lost.
How could this terrible thing happen? How did the Orbiter get closer to Mars than the scientists planned?Finally,they found the answer.Two teams of scientists worked together on the Orbiter.One team was in England,and one team was in United States.There were many similarities in the way they worked,but there was one important difference:The teams used different guidelines for measuring things.The United States team used the metric system(公制).The other team used the English system.
Because they used different systems,the scientists made a mathematical mistake.The Orbiter's orbit(the shape and pattern of its path)around Mars was not correct.The scientists put the Orbiter on the wrong path.The Orbiter got too close and too hot.And it stopped functioning.
Why didn't anybody see the mistake before it was too late? Many things contributed to the problem.One thing was that NASA scientists and mathematicians were working on two other spacecrafts at the same time.This was a challenge,and they were very tired from working long hours.
The Mars Climate Orbiter cost$94 million to build.It also cost a lot of money to try to find the lost Orbiter in space.In addition,NASA's research on the cause of the problem was very expensive.This wasn't the first time that two different measurement systems caused mistakes in scientific projects.However,the Mars Climate Orbiter was definitely the most expensive mistake of all!
选项
NASA built the Mars Climate Orbiter to get information about______.A:possible life on MarsB:the size of MarsC:the shape of MarsD:the atmosphere of Mars
答案
A
解析
题干意为“NASA建造火星气候轨道器以获取关于火星上可能有生命的信息。”短文第一段提到,“火星上有水吗? 火星上有生命吗? 曾经是否有生命? NASA的科学家想要知道这些问题的答案。他们建造了航天器绕火星飞行以获取这些信息。航天器的名字叫火星气候轨道器。”故选A。 题干意为“轨道器需要多长时间接近火星? 不到一年。”短文第二段前两句提到,火星气候轨道器于1998年12月向火星进发,旅程用了九个半月。故此选B。 题干意为“轨道器什么时候开始出现问题? 当它接近火星的时候。”短文第二段第三、四句提到,起初一切正常,然而当轨道器接近火星的时候,糟糕的事情发生了。故选B。 题干意为“是什么导致了轨道器的问题?科学家用了不同的测量系统。”短文第三段提出,有两组科学家一起开展关于轨道器的工作,一组在英国,另一组在美国。这两组科学家的工作方式大部分是相似的,但有一点重要的不同,那就是他们使用了不同的测量体系,美国组用的是公制,而英国组用的是英制,故选D。 题干意为“为什么NASA的科学家没有在轨道器前往火星前发现问题?”短文第五段第三、四句指出,其中的一个原因是,NASA的科学家和数学家在研究火星气候轨道器的同时还在研究另外两台航天器,长时间的工作让他们非常疲惫。故选D。
转载请注明原文地址:https://ti.zuoweng.com/ti/uKKfKKKQ
相关试题推荐
共用题干 (一)资料2013年1月,某审计组对丙公司2012年度财务收支情况进
共用题干 (一)资料2013年3月,某审计组对乙公司2012年度财务收支情况进
共用题干 (一)资料2012年3月,某审计组对甲公司2011年度财务收支情况进
共用题干 (一)资料2013年2月,某审计组对甲公司2012年度财务收支情况进
共用题干 (一)资料企业2010年末的资产总额为9900万元,其中:货币资金5
共用题干 (一)资料乙公司为增值税一般纳税人,适用的增值税税率为17%。201
共用题干 某企业拟购买一种债券作为短期投资,该债券面值1000元,5年后到期,
共用题干 某银行20x5年第一季度发生以下经济业务:1.取得人民币贷款利息收入
共用题干 某公司20×7年的税后净利润为1200万元,分配的现金股利为420万
共用题干 (一)资料甲公司2011年年初产品存货成本为300000元,2011
随机试题
个人理财业务属于商业银行的()。 A、公司金融业务 B、个人金融业务 C、
采暖工程热网布置形式中,环状管网的特点为()。
以下属于糖尿病患者“自我效能”的是
利用重复、声调的高低和简洁的语词等方法让家庭成员明了社会工作者谈话的内容,这属于
大豆与谷类食物混食,主要补充谷类中最缺乏的必需氨基酸是
学生的学习要以间接经验为主,以直接经验为()。
场地填筑的填料为爆破石渣、碎石类土、杂填土时,宜采用的压实机械为()。A.平碾B.羊足碾C.振动碾D.气胎碾
线性关系是指A.分析方法的准确度B.分析方法的重复性C.供试品的浓度与色谱法面积的关系D.药物熔融的温度E.溶液的酸碱度
共用题干 一般资料:求助者,女性,18岁,高中学生。案例介绍:求助者是一名重点中学高三的学生,各门功课的成绩在班里都是很拔尖的。求助者觉得,自己为了防备...
为了保证绩效面谈的质量,提高信息反馈的有效性,信息反馈应具有( )A.真实性B.系统性C.针对性D.主动性E.及时性