首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
财务会计
Building a house costs quite a lot of mo
Building a house costs quite a lot of mo
tikufree
2019-12-17
23
问题
Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.When the builder starts to build a house, his estimate will have to be corrected and revised because _______.
选项
A.it is wrongly worked out by a workmanB.the future owner of the house thinks the estimate is so high that he cannot afford the buildingC.the prices of building materials and the expenses of labor may be different from the original prices and expensesD.estimates are usually mistaken in the beginning
答案
C
解析
本题属细节考查题。考查的是在盖房的施工中,最初的预算必须更正与修改的原因。短文第二段的倒数一、二句就有相对应的部分;随后,当他开始施工时,此预算必须更改与修正。他的预算的根据是当时的价格,而建筑材料与其他东西的价格在制定预算和开始施工这一阶段很可能会有变化。A项说的是“预算经常被施工者算错”,在短文中找不到依据;B项的“未来的房主认为预算太高他支付不起”在短文中也没有体现,D项的“在开始时预算往往是错的”与A项的错误一致.
转载请注明原文地址:https://ti.zuoweng.com/ti/4K49KKKQ
相关试题推荐
______newbuildingswillbebuiltinmy
根据下列内容,回答191-195题。 Buildingahousecos
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Theheatingsystemofthisbuildingism
随机试题
下列选项不属于电子商务经营者的是()。 A、在某二手交易平台销售汽车的甲公司
类风湿关节炎控制病情的药物首选 A.非甾体抗炎药 B.慢作用抗风湿药 C.
以下有关股权投资基金与被投资公司签署投资协议主要条款中,董事会席位条款()
终末消毒是指( ) A.对现在存在或曾经存在过传染源的疫源地进行消毒 B.
某老师认为一个人的心理和行为与大多数人一致,他的心理就是健康的。这位老师所持的心理健康标准是()A.常规标准B.临床标准C.社会适应标准D.生活适
乙从代售店购得手表的行为,其结果为()。A:不当得利B:所有权的转移C:善意取得D:侵占
甲商贸公司位于市区,实际占地面积为5000平方米,其中办公区占地4000平方米,生活区占地1000平方米。甲商贸公司还有一处位于农村的仓库,租给公安...
证券金融公司开展转融通业务,应当以自己的名义,在证券登记结算机构分别开立()。 ①转融通专用资金账户 ②转融通专用证券账户 ③转融通担保证券账...
根据《水利水电工程标准施工招标文件》,变更的范围和内容包括()等。A.增加合同中任何一项工作内容B.改变合同中任何一项工作的标准或性质C.增加合同中
已知某项目的年总成本费用为2000万元,年销售费用、管理费用合计为总成本费用的15%,年折旧费为200万元,年摊销费为50万元,年利息支出为100万元,则...