Building a house costs quite a lot of mo
Building a house costs quite a lot of mo
tikufree
2019-12-17
19
问题
Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.When the builder starts to build a house, his estimate will have to be corrected and revised because _______.
选项
A.it is wrongly worked out by a workmanB.the future owner of the house thinks the estimate is so high that he cannot afford the buildingC.the prices of building materials and the expenses of labor may be different from the original prices and expensesD.estimates are usually mistaken in the beginning
答案
C
解析
本题属细节考查题。考查的是在盖房的施工中,最初的预算必须更正与修改的原因。短文第二段的倒数一、二句就有相对应的部分;随后,当他开始施工时,此预算必须更改与修正。他的预算的根据是当时的价格,而建筑材料与其他东西的价格在制定预算和开始施工这一阶段很可能会有变化。A项说的是“预算经常被施工者算错”,在短文中找不到依据;B项的“未来的房主认为预算太高他支付不起”在短文中也没有体现,D项的“在开始时预算往往是错的”与A项的错误一致.
转载请注明原文地址:https://ti.zuoweng.com/ti/4K49KKKQ
相关试题推荐
______newbuildingswillbebuiltinmy
根据下列内容,回答191-195题。 Buildingahousecos
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Buildingahousecostsquitealotofmo
Theheatingsystemofthisbuildingism
随机试题
下列行为适用于除斥期间的是()。 A、甲对无权代理行为的追认权 B、乙对无权
关于普通混凝土的说法,不正确的是()。
在中国古典园林的发展过程中,唐代是一个非常重要的时期。关于古人的居住理想,白居易
下列属于《审计法》法律责任的特点的有( )。
某高新技术企业按业务的分类,成立了三个针对不同产品的事业部,各事业部下设研发团队
股价指数的编制方法有简单算术股价指数和加权股价指数两类。()
下列因素中哪些是肾前性氮质血症的诱因
电力机车的主电路主要由高电压、大功率电器部件及附属测量、保护部件组成,完成电能与机械能之间的相互转换,产生_______和制动力。
中药片剂创用于20世纪50年代,近些年来,随着新技术、新工艺、新设备的应用,中药片剂的品种日益增加,已经发展成为目前临床应用最广泛的剂型之一。 片剂包糖...
根据营运组织形式,旅游客运可分为()。A:旅游班车B:旅游包车C:直达班车D:普通班车E:普快班车