首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
职称考试
As preparations were not completed in time,the conference had to be delayed t...
As preparations were not completed in time,the conference had to be delayed t...
admin
2020-12-24
53
问题
As preparations were not completed in time,the conference had to be delayed till the next Tuesday.()
选项
A.put away
B.cancelled
C.put aside
D.postponed
答案
D
解析
同义联想: delay, postpone ,put off
转载请注明原文地址:https://ti.zuoweng.com/ti/BtMQKKKQ
相关试题推荐
Weexploredthepossibilityofexpansionattheconference.()A.offeredB.investi
Asmallnumberoffirmshaveceasedtrading.(2004年真题)()A.completedB.finished
Aspreparationswerenotcompletedintime,theconferencehadtobedelayedt...
Aspreparationswerenotcompletedintime,theconferencehadtobedelayedt...
TheAIDSconventionwillbeheldinGlasgow.A:partyB:conferenceC:celebration
Weexploredthepossibilityofexpansionattheconference.A:offeredB:investiga
Asmallnumberoffirmshaveceasedtrading.A:completed B:finished C:fulfilled
Weexploredthepossibilityofexpansionattheconference.()A.offeredB.include
Aspreparationswerenotcompletedintime,theconferencehadtobedelayedt...
Aspreparationswerenotcompletedintime,theconferencehadtobedelayedt...
随机试题
砌筑砂浆应采用水泥砂浆,其强度等级应符合设计要求,且不应低于()
站用交流电源系统精益化评价细则中,规定安装投运技术文件不包括(____)。
下列各项属于旅行社质量管理中环境质量管理的有( )。
在资本主义社会,利息的本质是( )。
某些疾病患者入院后可能需要医务社会工作者运用危机介入的方法提供帮助。下列各项不属
全面竣工验收的阶段划分为()。
压力容器安装前,应检查()等。 A、生产的许可证明 B、技术质量文件
在短路的实用计算中,通常只用()的有效值来计算短路功率。 (A)非周期分世电流(B)短路全电流(C)短路电流自由分狱(D)周期分量电流
该地区2008年国内生产总值中第三产业占比约为()A.20%B.25%C.46%D.38%
我国现行的法定药品质量标准是A:《中国药典》和CFDA颁布的药品标准B:《中国药典》和企业药品标准C:局颁药品标准和企业药品标准D:《中国药典》和临床研究