After the switch malfunction, electrical service on the main building was ___...

admin2020-12-24  30

问题 After the switch malfunction, electrical service on the main building was _____ restored at 8 PM.

选项 A. finally
B. constantly
C. consecutively
D. usually

答案A

解析
转载请注明原文地址:https://ti.zuoweng.com/ti/FhG8KKKQ
随机试题