问题
下面有 3 篇短文,每篇短文后有 5 道题。请根据短文内容,为每题确定 1 个最佳选项。
Can You Hear This ?
When something creates a sound wave in a room or an auditorium (礼堂) , listener shear the sound wave directly from the source. They also hear the reflections as the sound bounces off the walls, floor, and ceiling. These are called the reflected wave or reverberant (反射的) sound, which can be heard even after the sound is no longer coming from the source.
The reverberation time of an auditorium is determined by the volume or interior size of the auditorium. It is also determined by how well or how poorly the walls, ceiling, floor, and contents of the room (including the people) absorb sound. There is no ideal reverberation time, because each use of an auditorium calls for different reverberation. Speech needs to be understood clearly; therefore rooms used for talking must have a short reverberation time. The full-sound performance of music such as Wagner operas or Mahler symphonies should have a long reverberation time. The light, rapid musical passages of Bach or Mozart need a reverberation time somewhere between.
Acoustic problems often are caused by poor auditorium design. Smooth, curved (弯曲的)reflecting surfaces create large reflections. Parallel (平行的)walls reflect sound back and forth, creating a rapid, repetitive pulsing (有节奏的跳动) effect. Large pillars (柱)and
corners can cause acoustic shadows as the sound waves try to pass around the object. Some of these problems can be solved by using absorbers and reflectors to change the reverberation time of a room. For example, hanging large reflectors, called clouds, over the performers will allow some sound frequencies to reflect and others to pass to achieve a pleasing mixture of sound.
Large pillars and corners may
选项
A make sound rich and full.
B be cures for sound problems.
C be sources of sound problems.
D function as well as clouds.
答案
C
解析
转载请注明原文地址:https://ti.zuoweng.com/ti/GssQKKKQ
相关试题推荐
下面的短文有5处空白,短文后有6个句子,其中5个取自短文,请根据短文内容将其分别放回原有位置,以恢复文章原貌。 ADoctorintheHou...
下面的短文有5处空白,短文后有6个句子,其中5个取自短文,请根据短文内容将其分别放回原有位置,以恢复文章原貌。 ADoctorintheHou...
下面的短文有5处空白,短文后有6个句子,其中5个取自短文,请根据短文内容将其分别放回原有位置,以恢复文章原貌。
下面的短文有5处空白,短文后有6个句子,其中5个取自短文,请根据短文内容将其分别放回原有位置,以恢复文章原貌。
下面的短文后有2项测试任务:(1)第23~26题要求从所给的6个选项中为第1~4段每段选择1个最佳标题;(2)第27~30题要求从所给的6...
下面的短文后有2项测试任务:(1)第23~26题要求从所给的6个选项中为第1~4段每段选择1个最佳标题;(2)第27~30题要求从所给的6...
下面的短文后有2项测试任务:(1)第23~26题要求从所给的6个选项中为第1~4段每段选择1个最佳标题;(2)第27~30题要求从所给的6...
下面的短文后有2项测试任务:(1)第23~26题要求从所给的6个选项中为第1~4段每段选择1个最佳标题;(2)第27~30题要求从所给的6...
下面的短文后有2项测试任务:(1)第23~26题要求从所给的6个选项中为第1~4段每段选择1个最佳标题;(2)第27~30题要求从所给的6...
下面的短文后有2项测试任务:(1)第23~26题要求从所给的6个选项中为第1~4段每段选择1个最佳标题;(2)第27~30题要求从所给的6...
随机试题
工程成本管理的环节包括( )。 A、预测、计划和控制 B、预测、计划、控制
受药物剂型因素影响最大的体内过程是 A.吸收 B.转化 C.代谢 D.排
以下哪一种肌肉不参与构成软腭 A.腭咽肌 B.腭舌肌 C.咽上缩肌 D.
患者,女,65岁。进行性厌食和上腹部胀痛,进食发噎,日益消瘦1年。查体:面色苍白
A.抑郁症 B.躁狂症 C.晕动病 D.精神分裂症 E.重症肌无力
下列各项中,不能作为编制记账凭证依据的是()。
新药Ⅱ期临床试验是在患者中进行,试验病例数至少为
在下列年龄段的年满16岁以上的自由公民中,失业率超过10%的是:
C
在《标准施工招标文件》中,合同条款规定的可以合理补偿承包人索赔费用的事件有( )A.发包人要求向承包人提前交付材料和设备B.发包人要求承包人提前竣工C.施