After the switch malfunction, electrical

题库总管2019-12-17  4

问题 After the switch malfunction, electrical service on the main building was _____ restored at 8 PM.

选项 A. finally B. constantly C. consecutively D. usually

答案A

解析
转载请注明原文地址:https://ti.zuoweng.com/ti/UF19KKKQ