London’s First Light Rail System
Docklands Light Railway (DLR) took just three years to build at a cost of £ 77 million It is London’s first Light Rail System,but its route follows that of a number of older lines which carried the nineteenth century railways through the crowded districts of the East End.
The section of the line from the Tower Gateway Station to Poplar follows the line of one of london's earliest railways, the London Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided
transport for the messengers and clerks who went backwards and forwards between the docks (码头)and the city every day.
From Poplar to Island Gardens,a new line crosses high above the dock waters,and then joins the old track of the Millwall Extension Railway, built to service the Millwall Docks (1868) and to provide transport for workers in the local factories. This line was horsepart drawns for part of its route, until the 1880s.
The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of England. There were major railway works and sidings (岔线)at Bow until recently.
The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable;on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and selfservice ticket machines, at every station.
"This line" in Paragraph 3 refers to
选项
A the line from the Tower Gateway Station to Poplar.
B the line from Poplar to Island Gardens.
C the Millwall Extension Railway.
D the line from Poplar to Stratford.
答案
C
解析
转载请注明原文地址:https://ti.zuoweng.com/ti/VCsQKKKQ
相关试题推荐
Themosturgentproblemanyeconomicsystemfacesishowtouseitsscarcere...
I'mworkingwithaguyfromLondon.
Theyaretryingtoidentifywhatiswrongwiththepresentsystem.A:proveB:dis
ImmuneFunctions Theimmunesystemisequalincomplexitytothecombinedi...
ImmuneFunctions Theimmunesystemisequalincomplexitytothecombinedi...
ImmuneFunctions Theimmunesystemisequalincomplexitytothecombinedi...
共用题干 第一篇EatingPotatoesGivesYourImmuneSystemaBoostEatingpotatoesisn...
Londonquicklybecameaflourishingport.A:majorB:largeC:successfulD:commer
Wehavetoactwithintheexistinglegalframework.A:systemB:limitC:procedure
Eventually,shegotajobandmovedtoLondon.AFinallyBertainlyCLuckilyDNat
随机试题
从广义上讲,工程项目绩效评价不包括()。 A.项目后评价 B.项目跟踪评价
(94-96题共用备选答案) A.盐水浴 B.苏打浴 C.松脂浴 D.凉
以落下质量表示规格的锻造设备有()。
借款人用于建设项目的其他资金(自筹资金和其他银行贷款)可不与贷款同比例支用。()
对2型糖尿病表现为单纯餐后血糖高,空腹喝餐前血糖水平不高者可首选的药物是
麻黄汤治疗的证型是
关于“基因表达”的概念错误的是
采用水泥土搅拌桩加固地基,桩径取d=0.5m,等边三角形布置,复合地基置换率m=0.18。桩间土承载力特征值fak=70kPa,桩间土承载力折减系数β...
美国心理学家韦纳把归因分为三个维度:内部归因和外部归因,稳定性归因和非稳定性归因,____。
建设投资中,下列()属于项目静态投资。 A.基本预备费B.建设期问新增税费 C.涨价预备费D.建设期利息