首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
职称考试
London’s First Light Rail System Docklands Light Railway (DLR) took just t...
London’s First Light Rail System Docklands Light Railway (DLR) took just t...
admin
2020-12-24
10
问题
London’s First Light Rail System
Docklands Light Railway (DLR) took just three years to build at a cost of £ 77 million It is London’s first Light Rail System,but its route follows that of a number of older lines which carried the nineteenth century railways through the crowded districts of the East End.
The section of the line from the Tower Gateway Station to Poplar follows the line of one of london's earliest railways, the London Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided
transport for the messengers and clerks who went backwards and forwards between the docks (码头)and the city every day.
From Poplar to Island Gardens,a new line crosses high above the dock waters,and then joins the old track of the Millwall Extension Railway, built to service the Millwall Docks (1868) and to provide transport for workers in the local factories. This line was horsepart drawns for part of its route, until the 1880s.
The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of England. There were major railway works and sidings (岔线)at Bow until recently.
The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable;on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and selfservice ticket machines, at every station.
"This line" in Paragraph 3 refers to
选项
A the line from the Tower Gateway Station to Poplar.
B the line from Poplar to Island Gardens.
C the Millwall Extension Railway.
D the line from Poplar to Stratford.
答案
C
解析
转载请注明原文地址:https://ti.zuoweng.com/ti/YbsQKKKQ
相关试题推荐
共用题干 第二篇RailroadSupersystemInrecentyears,railroadshavebeencombiningwi...
共用题干 第二篇RailroadSupersystemInrecentyears,railroadshavebeencombiningwi...
共用题干 第二篇RailroadSupersystemInrecentyears,railroadshavebeencombiningwi...
共用题干 第二篇RailroadSupersystemInrecentyears,railroadshavebeencombiningwi...
共用题干 第二篇StarQualityAnewanti-cheatingsystemforcountingthejudges'sco...
ImmuneFunctions Theimmunesystemisequalincomplexitytothecombinedi...
ImmuneFunctions Theimmunesystemisequalincomplexitytothecombinedi...
ImmuneFunctions Theimmunesystemisequalincomplexitytothecombinedi...
Themosturgentproblemanyeconomicsystemfacesishowtouseitsscarcere...
Thegovernmentproposedchangestothevotingsystem.A:statedB:declaredC:sugg
随机试题
在前提条件不变的情况下,( )情况会使消费者对一种房地产的现时需求增加。 A
烟酸的主要营养作用 A、参与生物氧化过程 B、是葡萄糖耐量因子的组成
国际收支失衡的原因主要有:
下列关于债券型理财产品的表述,正确的有( )。
《中华人民共和国海洋环境保护法》规定:新建、改建、扩建海岸工程建设项目,必须遵守
国有土地使用权出让合同争议的解决方式不包括()。
为防止有害气体中毒伤员继续中毒,首先将伤员转移到空气新鲜的地方。
关于侵蚀性葡萄胎的特点、诊断和治疗,下列哪项错误A.多发生在葡萄胎术后6个月内B.葡萄胎术后仍有阴道出血,子宫仍大于正常C.葡萄胎术后8周hGG下降不满意
根据《合同法》,允许单方解除合同的情形是()。A、由于不可抗力致使合同不能履行B、法定代表人变更C、当事人一方发生合并、分立D、当事人一方违约
下列项目的进项税额不得从增值税销项税额中抵扣的是()。A.接受的旅客运输服务B.作为提供交通运输业服务的应征消费税的自用摩托车、汽车、游艇C.购进农产品