首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
职称考试
共用题干 第三篇Who Came First, the Chicken or the Egg?I just mailed the chicken and...
共用题干 第三篇Who Came First, the Chicken or the Egg?I just mailed the chicken and...
admin
2020-12-24
17
问题
共用题干
第三篇
Who Came First, the Chicken or the Egg?
I just mailed the chicken and the egg,each in its own separate packaging,and kept
careful track of when each shipment was sent from a post office in Cambridge,
Massachusetts,and when it later arrived at its intended destination in New York City.
In mailing the chicken,I was careful to adhere to the restrictions described in the
American Postal Service's Domestic Mail Manual 57,as updated on April 3,2003.This,
the most recent,version of the Manual states that:"Adult chickens must be sent by
Express Mail.The containers used must pass the standards in International Safe Transit
Association Test Procedure IA;be strong enough to endure normal handling;and ensure
enough air for the chickens in transit...The number of birds must not be more than the
container's limit."
I mailed the chicken in a wooden box got from a colleague who does research with
birds.
Then,I mailed the egg in standard packaging obtained through an industrial supplier.
It's quite simple.
I posted both the chicken and the egg at 9:40 am,on a Monday morning,from the
Harvard Square post office,in Cambridge,Massachusetts.The staff there told me that
this was the first chicken anyone had mailed from there in recent memory,and perhaps
ever.They handled both the chicken and the egg skillfully and politely.
The intended destination for both packages was the James A.Farley General Post
Office,which is located in Manhattan right next to the Penn Station train terminal.
I took the subway from the Harvard Square to the Boston train station,and from there
boarded a train to New York City,a distance of about 320 kilometers,arriving that
afternoon at Penn Station.I immediately went to the post office,to await the arrivals of the
chicken and the egg.
The James A.Farley General Post Office is open 24 hours a day,so I was able to
wait there until both items arrived.I inquired once per hour for both the chicken and the
egg.
That day,Monday,neither the chicken nor the egg arrived.The next day,Tuesday,
neither the chicken nor the egg arrived.
The chicken arrived at 10:31 am,Wednesday.The staff at the post office told
me that this was the first chicken anyone had mailed to the post office in recent memory,
and perhaps ever.The egg arrived that same day,at 9:37pm,11 hours after the
chicken.
Based on experiment data,it's now quite clear that the chicken came first,the egg
second.
选项
Why did the author go to New York City?
A:Because he had never been there before.
B:Because he wanted to show that he could arrive before both the chicken and the egg.
C:Because he wanted to check which of the two items would arrive first.
D:Because he had sent the chicken and the egg to himself.
答案
C
解析
转载请注明原文地址:https://ti.zuoweng.com/ti/iMMQKKKQ
相关试题推荐
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 EconomicReforminChinaMoreUSsinologistshaveexpressedconfidencei...
共用题干 TheJoyofLivingAloneMoreandmoreAmericansarelivingalone.Someli...
共用题干 TheJoyofLivingAloneMoreandmoreAmericansarelivingalone.Someli...
随机试题
()强调绩效考核的结果应当更多地应用于薪酬分配,激励员工最大限度地发挥潜能。
金属反射绝热结构主要采用的施工方法是()。
商业银行内部控制措施主要包括()。
商业银行贷款安全性调查的内容包括()。
“原材料”账户应按照购入材料的品种、规格分别设置明细分类账户,包括()等
首选采用的修复是 A银汞合金充填术 B复合树脂黏接修复术 C银汞合金
与其他职业行为准则相比,职业道德的特征包括()。 A.超稳定性B.适用范围上的无限性 C.表现形式上的单一性D.—定的强制性
下列“请示”的结束语中得体的是( )。A.以上事项,请尽快批准B.以上所请,如有不同意,请来函商量C.所请事关重大,不可延误,务必于本月l0日前答复
采用工程量清单计价模式时,不得作为竞争性费用的有()。A.安全文明施工费B.其他项目费C.规费D.税金E.风险费用
施工总体部署是施工组织设计的重要内容之一,其主要内容有( )。A、建立施工管理机构B、划分施工任务C、编制资源供应计划D、安排施工顺序E、制定季