职称考试
共用题干 第三篇Listening Device Provides Early Landslide(山崩;地滑;塌方)WarningA device t...
共用题干 第三篇Listening Device Provides Early Landslide(山崩;地滑;塌方)WarningA device t...
admin
2020-12-24
22
问题
共用题干
第三篇
Listening Device Provides Early Landslide(山崩;地滑;塌方)Warning
A device that provides early warning of a landslide by monitoring vibrations(振动)in soil is being tested
by UK researchers,The device could save thousands of lives each year by warning when an area should be
evacuated(疏散,撤走),the scientists say. Such natural disasters are common in countries that experience
sudden, heavy rainfall (降雨,降雨量), and can also be triggered by earthquakes and even water
erosion(腐蚀,侵蚀).
Landslides start when a few particles of soil or rock within a slope start to move,hut the early stages can
be hard to spot.Following this initial movement,"slopes can become unstable in a matter of hours or
minutes,"says Nell Dixon at Southborough University,UK. He says。warning system that monitors this
movement"might be enough to evacuate a block of flats or clear a road,and save lives".
The most common way to monitor a slope for signs of an imminent(即将发生的) landslide is to watch
for changes in its shape. Surveyors can do this by measuring aside directly,or sensors(传感器)sunk into
boreholes(钻孔,井眼)or fixed above ground can be used to monitor the shape of a slope. Slopes can,
however,change shape without triggering a landslide,so either method is prone to causing false alarms.Now
Dixon's team has developed a device that listens for the vibrations caused when particles begin moving
within a slope.
The device takes the form of a steel pipe dropped into a borehole in a slope.The borehole is filled in
with gravel(砾,沙砾,砾石)around the pipe to help transmit high-frequency vibrations generated by particles
within the slope.These vibrations pass up the tube and are picked up by a sensor on the surface.Software
analyses the vibration signal to determine whether a landslide may be imminent.
The device is currently being tested in a 6-metre-tall artificial clay embankment(堤岸)in Newcastle,
UK.Early results suggest it should provide fewer false positives than existing systems.Once it has been
carefully and thoroughly tested,the device could be used to create a complete early-warning system for
dangerous slopes.
"Locations with a significant risk of landslides could definitely benefit from a machine like this,"says
Adam Poulter,an expert at the British Red Ci?oss,"As long as it doesn't cost too much."But,Poulter adds
that an early-warning system may not be enough on its own."You need to have the human communication."
he says,"Making systems that get warnings to those who need them can be difficult."
选项
Which of the following statements is true of landslides?
A:The initial movement is hard to spot.
B:They start with a movement of a few particles of soil or rock.
C:They can be destructive in a matter of hours or minutes.
D:All of the above.
答案
D
解析
短文第一段第一句提到了山体滑坡,此处的自然灾害指的是上文的山体滑坡,故选D。
短文第二段第一、二句提到“滑坡开始时,一个山坡上的土壤或岩石粒子移动,但初期 可能很难辨认。然后山坡在数小时或数分钟内可能变得不稳固”,故选D。
短文第三段倒数第二句提到“……任何一种方法(普通方法)都可能产生错误预警”,故 选C。
根据短文第四段第二句可知,地上凿出的洞而非该装置是用砾石填充的,A项的叙述不 正确。故选A
此句意为“早期的结果表明它应该提供比现有系统更少的不实证据”,故选B。 positive 意为“确凿的证据”。第5部分:补全短文
转载请注明原文地址:https://ti.zuoweng.com/ti/sysQKKKQ
相关试题推荐
共用题干 TheStoryteller1StevenSpielberghasalwayshadonegoal:totellasma...
共用题干 TheStoryteller1StevenSpielberghasalwayshadonegoal:totellasma...
共用题干 TheStoryteller1StevenSpielberghasalwayshadonegoal:totellasma...
共用题干 TheStoryteller1StevenSpielberghasalwayshadonegoal:totellasma...
共用题干 TheStoryteller1StevenSpielberghasalwayshadonegoal:totellasma...
共用题干 WhenOurWordsCollide"Wannabuyabody?"Thatwastheopeninglineof...Th
共用题干 FamilyHistoryInanagewhenthetechniqueisdevelopingfasterthanev...
共用题干 FamilyHistoryInanagewhenthetechniqueisdevelopingfasterthanev...
共用题干 FamilyHistoryInanagewhenthetechniqueisdevelopingfasterthanev...
共用题干 FamilyHistoryInanagewhenthetechniqueisdevelopingfasterthanev...
随机试题
以下肥厚型心肌病的超声心动图特征的描述,错误的是 A.室间隔厚度>13mm
甲与乙之间没有意思联络,甲开枪击中P心脏,乙开枪击中P脑袋,P死亡。正确说法是:
手机银行业务包括(?)。
DD本题考查是对图形中的俯视图和侧视图,第一段的图形中的第二幅图是第一幅的俯视图,第三幅是第一幅的侧视图,按照上述规律,因此,得出本题答案D
劳务分包合同重要条款包括( )。 A、企业法人代表 B、保险 C、工
FIDIC施工合同条件下,工程师发布删减某部分工作的变更指令,承包商由此损失的
队列研究的基本特征是( ) A.调查者必须在研究人群发病或发生死亡前开始研究
根据一定标准和原则所划定的调整同一类社会关系的法律规范的总和被称为()。A.法律体系B.法律部门C.法学体系D.法律汇编
牙周病的医源性因素应除外A.冠桥及银汞充填的悬突边缘B.正畸矫治器过于伸入龈下C.过凸的修复体外形D.两牙邻面均有充填体E.基牙的咬合负担过大
适宜对数值解法进行检验和比较、拟合观测资料以求得水动力弥散系数的是()。A:地下水量均衡法B:地下水流解析法C:地下水溶质运移解析法D:地下水数值模型