首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
职称考试
At that time,we did not fully grasp the significance of what had happened.A. giv
At that time,we did not fully grasp the significance of what had happened.A. giv
admin
2020-12-24
47
问题
At that time,we did not fully grasp the significance of what had happened.
选项
A. give
B. understand
C. attach
D. lose
答案
B
解析
grasp这个动词是“抓住”的意思,可用于具体的事物,如:grasp the rope/my hand抓住绳索/抓住我的手,也可以用于抽象的概念,如:grasp the main idea/ his meaning抓住要点/理解他的意思。在本句中grasp the significance of what had happened就相当于understand the significance of what had happened.
转载请注明原文地址:https://ti.zuoweng.com/ti/Ez9QKKKQ
相关试题推荐
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.Agiv
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.Agive
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.()A.g
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.()A.g
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.A.giv
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.A.giv
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.A.giv
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.A.giv
Atthattimewedidnotfullygraspthesignificanceofwhathadhappened.A:give
Atthattime,wedidnotfullygraspthesignificanceofwhathadhappened.Agiv
随机试题
会计信息质量要求是对企业财务报告中所提供会计信息质量的基本要求,它主要包括:
如今,挖掘历史人文资源以推动旅游成为一种流行思路,这本没有错。可不少地方的操作手
根据《建筑工程建筑面积计算规范》(GB/T50353--2005),按其结构底
某住房建设局受理一公司的建筑工程施工许可申请后,在法定期限内未予答复,该公司向法
建设工程造价中的工程费用是指()。
2010年10月,江夏市公用事业局所属客管处就本市新增的300个出租车营运的使用
( )是指项目监理机构在施工单位自检的同时,按照有关规定、建设工程监理合同约定
若信道的复用是以信息在一帧中的时间位置(时隙)来区分,不需要另外的信息头来标志信息的身份,则这种复用方式为( )。A.异步时分复用B.频分多路复用C.同步
与场内期权相比,场外期权的特点是()。A.合约非标准化B.交易品种多样、形式灵活、规模巨大C.交易对手机构化D.流动性风险和信用风险大
下列插入图表的操作步骤中正确的是______。A.打开Excel文件,框选需要生成图表的数据清单、列表或者数据透视表B.选择“插入”菜单中的“图表”菜单C.