首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
财务会计
共用题干 第一篇An Expensive MistakeIs there wa
共用题干 第一篇An Expensive MistakeIs there wa
昕玥
2019-12-17
18
问题
共用题干第一篇
An Expensive Mistake
Is there water on the planet Mars? Is there life on Mars?Was there ever life on Mars?Scientists from
NASA wanted to know the answers to tliese questions.They built a spacecraft to travel around Mars and get
informnation.The spacecraft was called the Mars Climate orbiter.
The Mars Climate Orbiter left for Mars iii December 1998.The trip took nine and a half months.At first,
everything was fine.However.when the Orbiter got near Mars,something terrible happened.The spacecraft
didn't go to the right place.It went too close to Mars.it was too hot for the Orbiter there.The spacecraft
couldn't function correctly.Suddenly,it stopped sending messages to NASA.The Orbiter was lost.
How could this terrible thing happen? How did the Orbiter get closer to Mars than the scientists
planned? Finally,they found the anlswer. Two teams of scientists worked together on the Orbiter. One team
was in England,and one teann was in the United States.There were many similarities in the way they
worked,but there was one important difference:The teams used different guidelines for measuring things.The
United States team used the metric systcnni(公制).The oilier team used the English system.
Because they used different systems,the scientists made a mathematical mistake.The Orbiter's orbit
(the shape and pattern of its path)around Mars was not correct.The scientists put the Orbiter on the wrong
path.The Orbiter got too close amid too hot,and it stopped functioning.
Why didn'tanybody see the mistake before it was too late?Many things contributed to the problem.
One thing was that NASA scientists and mathematicians were working on two other spacecrafts at the same
time.This was a challenge,and they were very tired from working long hours.
The Mars Climate Orbiter cost $94 million to build.It also cost a lot of money to try to find the lost Or-
biter in space.In addition,NASA's research on the cause of the problem was very expensive.This wasn't
the first time that two different measurement systems caused mistakes in scientific projects.However,the
Mars Climate Orbiter was definitely the most expensive mistake of all!
选项
NASA built the Mars Climate Orbiter to get information about_______.A:the size of MarsB:possible life on MarsC:the shape of MarsD:the atmosphere of Mars
答案
B
解析
文章第一段以三个问句开头:“火星上有水吗?"“火星上有生命吗?"“火星上有过生命吗?”接着指出NASA的科学家们想知道这些问题的答案,他们建造了航天飞船环绕火星飞行来获得信息。故选B。 由文章第二段第二句话可知,飞船从地球到火星的旅程花费了九个半月的时间,故选B。 由文章第二段第三、四句话“Atfirst,everythingwasfine.However,whentheOrbitergotnearMars,somethingterriblehappened.”可知飞船是在接近火星时出现问题的。 由文章第三段和第四段可知,来自英国和美国的两组科学家共同负责飞船的工作,他们在做计算工作时采用了不同的计算准则。这造成计算数据出错,导致飞船绕火星飞行的轨道出现偏差。故选D。 由文章倒数第二段可知,科学家们没能发现错误的其中一个原因是NASA的科学家和数学家们同时还要负责另外两个航天器的工作,长时间的工作使他们非常疲惫。故选C。
转载请注明原文地址:https://ti.zuoweng.com/ti/R9HfKKKQ
相关试题推荐
B题干中所有图形都是呈轴对称的平面图形。
D这是一道\"5+1\"题型的图形推理题,规律类别为组合关系。仔细地比较题干中给出的左边5个图形,不难发现,左边5个图形都是封闭图形,依据这一规律,可以推出第6个小
A这是一道\"5+1\"题型的图形推理题,规律类别为组合关系。仔细地比较题干中给出的左边5个图形,不难发现,左边5个图形,每个图却由2条曲线组成,并在排列上呈现出一
D这是一道\"5+1\"题型的图形推理题,规律类别为组合关系。仔细地比较题干中给出的左边5个图形,不难发现,左边5个图形,每个小图形中外图的直边数都大于内图的直边数
C这是一道\"5+1\"题型的图形推理题,规律类别为数量关系。仔细地比较题干中给出的左边5个图形,不难发现,左边5个图形,每个小图都由2种图形组成,依据这一规律,选
B这是一道\"5+1\"题型的图形推理题,规律类别为数量关系。仔细地比较题干中给出的左边5个图形,不难发现,左边5个图形除第1个小图外都是等边图形,根据相等的边的数
C这是一道“3-3-4\"类型的图形推理题,规律类别为组合关系。仔细地比较题干中给出的两套图形,不难发现,左边的一套图中包含三个图形,都是垂直轴对称图形。再考察右
B这是一道“3-3-4\"类型的图形推理题,规律类别为数量关系。仔细地比较题干中给出的两套图形,不难发现,左边的一套图中包含三个图形,各图中封闭区域的数量都为3。
A题干第一个图形的右上角与A的右上角相似,题干第四个图形的右下角与A的右下角相似,由此确定答案为A。组合方式如下图所示:
C题干第一个图形和第四个图形中的水平线、题干第二个图形和第三个图形中的竖直线分别构成C中的两组对边。组合方式如下图所示:
随机试题
BRP的概念是指对企业的业务流程进行根本性的在思考和彻底性的再设计,从而是企业在
下列有关PET检查在肺癌诊断和分期中应用的描述,哪项是错误的 A.PET检查是
外源性凝血系统的作用起始于 A、组织受伤释放组织因子Ⅲ B、凝血酶的形成
属于放置宫内节育器的项目,错误的是 A、发生子宫出血用氨基己酸 B、放置I
久期缺口等于资产加权平均久期与负债加权平均久期和()的乘积之差。
计算机系统的接地,下列说法正确的是()。 A.计算机系统内逻辑地、信号地、屏蔽
不准擅自更改操作票,不准随意()闭锁装置进行操作。
规划编制活动的工作环节不包括()。
最近三年来,捷达牌计算机的销量有了飞速的增长。而同一时期,该品牌用于电视广告的费
某投资组合在持有期为12个月,置信水平95%的情况下,若所计算的风险价值为5%,则表明()。A、该资产组合在12个月中的损失有5%的可能不超过95%B、该资