It is imperative that the contracts ____

书海库2019-12-17  20

问题 It is imperative that the contracts _______ at least a month prior to the beginning of the project.

选项 (A)finalize                (B)finalized                (C)be finalized                (D)finalizing

答案C

解析
转载请注明原文地址:https://ti.zuoweng.com/ti/l019KKKQ