首页
财务会计
医药卫生
金融经济
考公考编
外语考试
学历提升
职称考试
建筑工程
IT考试
其他
登录
职称考试
共用题干 第三篇Human Space ExplorationWhile scientists are searching the cause of t...
共用题干 第三篇Human Space ExplorationWhile scientists are searching the cause of t...
admin
2020-12-24
8
问题
共用题干
第三篇
Human Space Exploration
While scientists are searching the cause of the Columbia disaster,NASA is moving
ahead with plans to develop a new craft that would replace shuttles(航天飞机)on space
station missions by 2012 and respond quickly to space station emergencies.
The space agency released the first set of mission needs and requirements several days
ago for the orbital space plane(轨道航天飞机),which would be designed to transport a
crew of four to and from the International Space Station.
Although it includes few specifics, the plan states the orbiter(轨道航天飞机)will be
safer,cheaper and require less preparation time than the shuttle.It would be able to
transport four crew members by 2012一though it would be available for rescue missions by
2010.NASA says the craft should be able to transport injured or ill space station crew
members to "definitive(决定性的)medical care" within 24 hours.
The release of the requirements showed NASA remains focused on the long-term
priorities of space exploration,even as questions exist concerning the loss of Columbia and
its seven-member crew on February 1,2003.
Experts at Marshall Space Flight Center in Huntsville,Alabama,have been working for
years on a successor to the shuttle.The project,known as the Space Launch Initiative(倡
议),was divided last year into two parts一one focusing on a future launch vehicle,the
other on a space station orbiter. The orbiter is expected to be ready sooner.
The program's managers say NASA officials have told them not to alter Space
Launch Initiative in light of the Columbia disaster.
U.S. President George W. Bush asked Congress for about U.S.$1 billion for Space
Launch Initiative in 2004,funds that would be almost equally split between the Orbital Space
Plane and Next Generation Launch Technology.
选项
NASA plans to design the new space craft to
A:control the International Space Station.
B:carry astronauts to the International Space Station.
C:transport equipment to the International Space Station.
D:train astronauts in space flights.
答案
B
解析
转载请注明原文地址:https://ti.zuoweng.com/ti/ytsQKKKQ
相关试题推荐
共用题干 第一篇TryingtoFindaPartnerOneofthemoststrikingfindingsofarecen...
共用题干 第一篇TryingtoFindaPartnerOneofthemoststrikingfindingsofarecen...
共用题干 第一篇TryingtoFindaPartnerOneofthemoststrikingfindingsofarecen...
共用题干 第二篇StarQualityAnewanti-cheatingsystemforcountingthejudges'sco...
共用题干 第三篇WhoCameFirst,theChickenortheEgg?Ijustmailedthechickenand...
共用题干 第三篇WhoCameFirst,theChickenortheEgg?Ijustmailedthechickenand...
共用题干 第二篇Don'tCountonDungConservationists(自然保护主义者)maybemiscalculatingt...
共用题干 第二篇Don'tCountonDungConservationists(自然保护主义者)maybemiscalculatingt...
共用题干 第二篇Don'tCountonDungConservationists(自然保护主义者)maybemiscalculatingt...
共用题干 第二篇Don'tCountonDungConservationists(自然保护主义者)maybemiscalculatingt...
随机试题
下列属于组织文化内容的是( A.创新与冒险 B.注重细节 C.进取心 D
根据《机电产品国际招标投标实施办法》,必须招标的机电产品存在下列情形时,可以不进
世界上国家和地区分布最多的洲是()。
商品房预售的条件之一是,投入的开发建设资金应达到工程建设总投资的一定比例以上,并
某化学反应在任何温度下都可以自发进行,此反应需满足的条件是( )。
宜与蛤蚧同贮的是( )。
患者,男,26岁,5天来鼻及牙龈出血,皮肤瘀斑。血红蛋白55g/L,白细胞10
当确定了临床需求后,新方法选择评价和进入常规应用的主要流程的关键步骤为A:方法选择、规定质量目标、方法评价B:规定质量目标、方法评价、常规分析C:方法选择、
患者女,58岁,因慢性阻塞性肺疾病住院1个月,近5天来出现高热、咳痰,伴呼吸困难。实验室检查血肌酐及尿素氮值正常,白细胞计数为12×109/L,中性粒细胞...
社会工作者陈某在采用精神分析技术为服务对象提供心理治疗的过程中,突然发现服务对象是自己儿子所在单位的主管。面对这种情况,陈某应该()。A:利用此机会接近服务对象